Lineage
How the ideas grew, mutated, slept and came back
Feb 2026 Concept Doc → Feb framework docs → Aug charter and packages → Sep Phase 1 → Nov directory. Several current locks revive Feb-20 ideas without knowing it.

Legacy → current (27 concepts)
| Legacy concept | Where it was | Code | Current object |
|---|---|---|---|
| Project premise / identity | Charter final; projects.ts 2026-08-29 | DUP | PROBLEM_FRAME.md |
| Name meaning | What Does Anavaratha Mean zip; charter draft vs final | DUP+CON | BRIEF Q1 gate |
| Three domains | Charter; Core Package | IGN | (none in phase1) |
| Two directions → Freedom to Flourish | Project Package | IGN | (superseded) |
| Use → residual → regeneration | public premise | DUP | Frame A |
| Displacement test / accountable transition | Feb evaluation; charter §6 | EXT | Frame B |
| Negentropy as cautious metaphor | Charter §4; Core §12; Feb L1 | CON | Frame C syntropy-first |
| Exergy / accounting identity / holarchy | Feb L1 | IGN | (none) |
| Pressure reservoirs / visibility gradient | Feb L1 | DUP | QUESTIONS Q1, Q6 |
| Leverage points (Meadows; A–F) | Feb; Core Package | CON | (premature under Sensemaking) |
| Intervention typology + methodology | Feb 2026-02-24 docs | CON | KILL_LOG items 1,4 |
| Evaluation framework | Feb | IGN | (none) |
| Maturity model Mapped→Actionable | Charter §3 | DUP+CON | STAGE_EXIT_CRITERIA.md |
| Foundational sequence desk→…→action | Charter §3 | DUP | EVIDENCE_CATALOG.md posture |
| Evidence status vocabulary | Charter §3 | DUP | listed vs verified |
| Capacity chain / no public evidence system | Core Package | DUP | LEDGER §3–4 |
| WP compost 157 of 2,775 t/month | Core Package (Manipura 2025) | CON | LEDGER (b) counts compost as gain |
| Facility registers [WC] | waste_cycles zip | DUP | DIRECTORY geojson 707 features |
| 15-company operator list | Comprehensive Dataset zip (Oct) | DUP | DIRECTORY 487 operators |
| "Waste ecosystem platform" dashboard | ideas.md, *.tsx (Oct) | CON | KILL_LOG item 1 |
| Meethotamulla / Kerawalapitiya / Karadiyana | Core Package + [WC] | DUP | LEDGER L10, L20–22 |
| Data request pack (unsent drafts) | [WC] | DUP | call sheets (operator-level) |
| Material Afterlives evidence | Project Package 05_circulation | EXT | household-route research |
| Cultivation atlas / Osu Uyana | Project Package | IGN | (none; QS1 Dry Zone only) |
| Institutions as coordination / responsibility chain | Core §3C/§3F; [WC] map | DUP | DIRECTORY + LEDGER (unaware) |
| Tooling (DuckDB/Parquet, data/raw→processed) | Feb agent_context | IGN | (none) |
| Peace Valley boundary | — | NEW | BOUNDARY_MEMO (lock) |
anavaratha-legacy/OVERLAP_MAP.md §2 · DUP redo · EXT goes beyond · CON conflicts with a current lock · IGN ignored · NEW current only
